亚洲欧美中文高清在线专区-在线日本国产成人免费不卡-97精品国偷拍自产在线-免费精品国产人妻国语三上悠亚

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.